Post-Interview Total Silence Alert #108

Commercial MEP Project Superintendent

Company: Skanska USA
64 Days of Silence
4 Interview Round(s)

Candidate Experience Narrative

Senior mechanical/electrical superintendent completed phone pre-screening, two interviews with project executives, and an extensive clash-detection technical review on a major healthcare construction project. Project executives verbally indicated candidate was the preferred finalist. After completing the commissioning timeline review, candidate received zero communication for over 9 weeks, while the job remained listed on LinkedIn. 📋 Uncompensated Assessment Details: Hospital MEP clash detection review and medical gas commissioning timeline analysis ⭐ Ghost Severity Rating: 4.75 / 5.0 Rating Analysis: Near-maximum severity reflecting 4 intensive interview rounds (4.5), unpaid clash detection and commissioning plan (4.7), 64 days of silence (4.9), and strong industry validation (4.8). Rubric Breakdown: Silence: 4.9/5.0 | Rounds: 4.5/5.0 | Take-Home: 4.7/5.0 | Reposting: 4.9/5.0 | Consensus: 4.8/5.0 🔗 Community Discussion & Evidence: Reddit (540 upvotes, 138 comments) — https://www.reddit.com/r/Construction/comments/1em81ba/skanska_mep_superintendent_healthcare_ghosting/ 🔍 LinkedIn Footprint: Perpetually Reposted (10+ months). Active across major commercial and institutional building regions. Glassdoor candidate rating 2.1/5 for recruitment responsiveness.
Recruiter Contact (Protected)
r•••@s•••.com
Community Telemetry
+21 candidate community confirmations
Share warning: X / Thread